The duty pump has done the work. The standby may still have the damaged bearing.

Take a duty and standby pair on one plinth. Pump A runs; B waits on auto-start. If A trips, B can start and keep the process going, yet sound rougher than expected. A successful start does not tell the whole story of B's bearings.

The damage may predate that start by weeks. SKF's bearing damage handbook, p. 26, describes false brinelling and resulting noise in standby equipment left idle for long periods. To keep B ready, look at what happens while its shaft is not turning.

What changes when the shaft stops

In a turning bearing, each rolling element keeps moving onto fresh raceway and lubricant is carried back into every contact. When the shaft stops, that renewal stops. A few rolling elements in the lower part of the bearing, the load zone, now carry the weight of the shaft at the same spots, hour after hour (SKF, p. 26; NTN-SNR, Causes of bearing failures, PDF p. 22).

How lubricant reaches those spots changes too. In an oil-bath housing the oil settles to its static level. SKF asks for that level to reach the middle of the lowest rolling element at standstill, with the sight glass marked for both the static and the running level (SKF, p. 14).

The margin is small: Flowserve's Mark 3 manual, for a housing without the optional oil slinger, keeps the level within about 3 mm of the sight-glass centre (Flowserve 71569102, section 5.3.1.1). So a standby's oil has to be read against the static mark, and a small loss matters.

Where an oil ring feeds the bearing, it lifts oil only because the turning shaft drives it, so on a stopped standby it lifts none (SKF Evolution, oil pick-up ring; Sulzer, US10274015B2, background). A grease-lubricated bearing keeps its grease in the housing, but grease pushed out of a loaded contact may not find its way back while the shaft is still.

How a running neighbour marks a still bearing

Pump A shakes the plinth and the shared suction and discharge pipework, and through them pump B. In B's bearings the loaded rolling elements rock back and forth over a tiny distance without ever rolling away. NTN-SNR's failure guide, PDF p. 22, describes the chain: lubricant is forced out of the contact, metal touches metal, microscopic welds form and tear, and the loose particles oxidise and act as an abrasive that speeds the wear.

The result is a row of shallow depressions in the raceway at the same spacing as the rolling elements. This is false brinelling. SKF's handbook, following the damage classification in ISO 15243, files it under frictional corrosion (SKF, pp. 40 and 41; SKF Evolution on ISO 15243:2017). In a grease-lubricated bearing the marks are typically reddish-brown; with oil they can look mirror-shiny (SKF, p. 52).

How a still bearing wears

Follow the load, then look at the contact and the raceway.

The same contacts carry the stopped shaft

The stopped bearing's loaded contactsEnd section of a stopped ball bearing on a horizontal shaft. Shaft weight loads the lower three balls. Neighbouring vibration rocks those contacts without rolling them around the raceway.Shaft weightVibration inLoad zoneRocked in place, not rolling

The loaded balls stay in one part of the bearing. Vibration rocks them where they sit.

At one loaded contact

One contact, magnifiedA section through one loaded ball and its outer raceway. Small oscillations displace lubricant sideways, leaving metal contact and oxidised wear particles at the centre.Small back-and-forth movementLubricantmoves outMetal contact and wear particles

At teardown, look for the spacing

The wear pattern around the outer racewayThe outer raceway opened flat, with three equally spaced shallow wear marks inside its fixed load zone. Two outlined marks between them show a later standstill in a different shaft position.Outer raceway opened flatTopTopMarks repeat at ball spacingWear stays in the load zone

Filled marks: one standstill. Outlines: a later position. Grease marks are typically reddish-brown; oil marks can be mirror-shiny.

Vibration rocks the loaded balls in place and wears marks at ball spacing, only in the load zone. The outlined marks show how a later standstill in a new position can add another set. Based on NTN-SNR's and SKF's guides for a ball bearing on a horizontal shaft.

The marks are a history of the stops, not just the starts. SKF shows several sets at roller spacing in a bearing from auxiliary equipment with long idle periods. Vibration level, frequency and time at rest all affect how much damage forms (SKF, p. 52).

Pumps are not the only machines exposed. NTN-SNR gives an emergency generator on the same platform as a running one, and an emergency fan connected with an operating fan (NTN-SNR, PDF p. 22). In each case the bearing can be damaged while the machine stands by, and the first sign may be noise when it is finally needed.

Water collects while the pump waits

Vibration is not the only standstill risk. A housing that warms while running and cools after it stops can draw in humid air, and the moisture condenses on the bearing. NTN-SNR describes this cycle for a bearing in a very damp atmosphere that is started and stopped often: water builds up a little with each stop and corrosion spreads through the bearing (NTN-SNR, PDF p. 28). A standby that is run long enough to warm up and then stopped in damp weather can go through the same cycle.

Free water that does get in settles to the bottom of a stopped bearing and can etch the raceway, again at rolling-element spacing (SKF, pp. 28 and 50).

Before relying on a standby that has sat through a humid season such as the monsoon, check its drain or low point for water. Baldor's storage procedure for large motors asks for the same check at the drain before a stored motor that has been exposed to humid weather is operated (Baldor MN439, p. 1). Our article on water in oil covers the laboratory side of a water result.

Why no single rotation interval fits

The two bearing makers agree on the broad remedy. NTN-SNR says periodic rotation of a stationary machine in a vibration area, even slowly, lets the lubricant spread and keeps the load off the same spot. SKF says to rotate the shaft of standby machinery periodically, and adds that isolating the machine from the vibration is a real solution, though not always a practical one (NTN-SNR, PDF p. 22; SKF, p. 26).

Neither says how often. That has to come from the manual for your machine, and manuals give different answers because they describe different machines in different states.

Compare nine instructions from six documentsOpen the source comparison
How often to turn or run: nine instructions from six documents
DocumentMachineState the instruction coversWhat it asksReason given
KSB Vitastage manual 1969.85/03 (2017), section 3.3Hygienic multistage pumpIn storageTurn the shaft by hand once a month, for example via the motor fanNot stated beside the instruction
KSB Vitastage manual, section 6.3.1Same pumpInstalled, prolonged shutdownRun for about five minutes, between once a month and once every three monthsPrevent deposits in the pump and intake
KSB Vitastage manual, section 7.2.1Same pumpInstalled standbyStart the standby pumps once a weekMake sure they are ready for operation
Flowserve Mark 3 ANSI 71569102 (2025), sections 4.6 and 4.6.2Chemical process pumpStorage; long-term storage (6 to 12 months)Turn the shaft at regular intervals; in long-term storage, about 10 revolutions every three monthsPrevent brinelling of the bearings and sticking of seal faces
Flowserve Mark 3 ANSI, section 8.2, Table 23Same pumpInstalled standbyCheck daily that the standby is at the applicable temperature and available to startNo rotation interval given
Wilfley Model K assembly guideSlurry pumpInstallation delayed more than 15 days; out of use for a long periodTurn the shaft by hand once a weekLubricate the bearings and prevent rusting
Baldor MN439 (2015)Large AC motorsStorage up to 12 months10 to 15 revolutions once a month; once a week if store relative humidity is above 60 percentRedistribute the lubricant and prevent corrosion
WEG guide 50031071Low and high voltage motorsStorageAt least 5 turns at least once a month, leaving the shaft in a different positionPrevent bearing oxidation and spread the lubricant evenly
WEG T Line manual 12364818 rev. 04 (2026), sections 3.3.2 and 3.3.2.6Induction motors, types TGA and TGV, for oil and gas serviceStored two months or more before start-up, or installed and stopped for that longRemove the shaft lock and turn the rotor at least 10 complete turns every two monthsCirculate the grease and preserve the bearings
Each maker's instruction for its own machine and state, as published (checked 19 October 2026). Read the state column first: most entries are for storage, only a few cover an installed machine, and none is a recommendation for your equipment.

Read the state column before comparing intervals. KSB gives three answers in one manual: storage, prolonged shutdown and installed standby (sections 3.3, 6.3.1 and 7.2.1). The motor needs its own instruction too.

Conditions can change that instruction. Baldor's monthly turn becomes weekly above 60 percent relative humidity in storage (MN439, p. 3). Even two WEG documents give different intervals for their respective motors (guide 50031071; T Line manual, section 3.3.2.6). Those differences are reasons to find the applicable document, not to average the intervals.

Most of these intervals are written for storage. Among the motor documents, only the WEG T Line manual also applies its routine to a motor that is installed but stopped for two months or more (WEG 12364818, section 3.3.2). For an installed standby, Flowserve's maintenance checklist asks daily whether the pump is at the applicable temperature and available to start, and gives no rotation figure at all (Flowserve 71569102, section 8.2).

The stated reasons differ as well: deposits in the pump, sticking seal faces, brinelling, rust, grease distribution. Each instruction can be right for the document that gives it. None of them is an instruction for your pump.

Find the instruction for your machine as it stands today

Start by naming the state. A pump in the store, a pump installed but not yet commissioned, a standby on auto-start and a unit in a long shutdown are four separate situations, and the instruction you need belongs to only one of them.

Collect every document for the pump set: the pump manual, the motor manual and any separate gearbox, coupling or seal instructions. Search them for storage, shutdown, stand-by, standby, prolonged, rotate and turn. For the state you named, write down:

  • the maker, document number, revision and section;
  • the task: turn by hand or run, how many turns or minutes, and how often;
  • the conditions attached, such as humidity, oil level or the process conditions a run needs;
  • the reason the document gives, if it gives one.

If the pump and motor documents disagree, or none covers the state your machine is in, ask the manufacturers and file the reply with the record. Do not borrow the interval used on the pump next door.

Two safety points belong in the written task. Turning a shaft by hand means working on a machine that may be set to start automatically. KSB's manual tells the operator to make sure the pump set cannot be started unintentionally before working on it, so the turn needs the site's isolation procedure (KSB 1969.85/03, section 7.1).

A run is a real start, so it needs the conditions the manual sets for one, such as enough liquid supplied for the check run and a primed pump (KSB, section 6.3.1; Flowserve, section 6).

What a turn shows, and what a run shows

Turning the shaft moves the loaded rolling elements to new spots and lets lubricant spread over the old ones. It also shows that the shaft is free, which is why Flowserve's pre-commissioning checks end with a hand turn (Flowserve, section 6). It cannot show that the pump will start, deliver its flow or run quietly.

When you turn by hand, finish in a different position each time, as WEG asks for its motors in storage (WEG guide 50031071, section 2). A paint mark on the coupling lets the next person see where the shaft was left.

A planned run turns the bearings at speed and sets any oil ring working again. It also gives you operating readings, provided the required start conditions are met. Whether to turn, run, or do both still belongs to the applicable manual and the machine's owner.

A turn and a run answer different questions

Turn by hand

What it can show
The shaft is free at the time of the check. The loaded rolling elements move to new positions.
What it cannot establish
That the pump will start, deliver flow or run quietly.

Make a planned run

What it can show
That this pump starts and runs under the recorded conditions, with sound, temperature and vibration to compare.
What it cannot establish
How the automatic handover behaves when the duty pump trips unexpectedly.
Follow the applicable manual and site procedure for each check. A planned run is not the same as testing an automatic changeover.

Keep the comparison fair. Record speed, duty or load, the pumped liquid and its temperature, ambient conditions, measurement points and method, and the time elapsed since starting. Compare with B's earlier runs under similar conditions. A short check run is not directly comparable with a duty pump that has been running for hours. If conditions differ, record the difference before interpreting the readings.

The Flowserve Mark 3 manual, Table 6, explains that bearing temperature depends on operating conditions and takes time to settle. Use the requirements for the actual machine, not a borrowed settling time.

The automatic handover is a separate test for the controls and operations owners. A planned run does not establish how quickly B takes over after an unexpected loss of A. For readers looking after data-centre cooling pumps, Reliability Engine's Redundant on Paper works through that gap for a coolant distribution unit's spare pump.

Give the standby its own record

A standby does not age like its twin. It has fewer running hours, long spells at rest, and its neighbour's vibration arriving through the plinth and pipework. It needs its own history, not a line in the duty pump's file.

Standby readiness record

This standby

Standby asset and its duty partner
Standby for duty
State today (tick one)
In storeInstalled, not commissionedInstalled standby on auto-startLong shutdown
Pump instruction
Maker, document number, revision, section
Motor instruction
Maker, document number, revision, section
What it asks
Turn by hand or run; turns or minutes; how often; conditions (humidity, oil level, process conditions for a run)
Conflicts or gaps referred to
Who was asked, date, reply filed

Each turn or run

Record speed, duty or load, liquid and its temperature, ambient conditions, measurement points and method, and elapsed running time. Use this entry or a run-sheet reference. Note differences from the baseline before comparing readings.

DateTurn (turns) or run (minutes)Shaft left at (mark)Oil at static mark? Water at drain?Run context or record referenceNoise, temperature, vibration against matched baselineByNext action

The print layout includes five entries.

One record per standby. Keep its manual instructions, run context and follow-up together.

A record is worth keeping only if some entries change what happens next:

  • Water at the drain or low point. Follow the manual's response before relying on the pump, and trace where the water came from.
  • Oil off its static mark. Correct the level and find out why it moved.
  • A shaft that is hard to turn. Do not start the pump until the cause is known.
  • Changed running condition. If B is noisier, hotter or rougher under comparable conditions, record the difference and follow the site's abnormal-operation procedure. Refer an unexplained change for condition assessment. Compare with A only when its operating conditions and measurement method are comparable too.
  • A missed turn or run. Record it as missed, with the reason and the next action. A completed task and a healthy machine are two different things; the record needs evidence of both.

If B's oil is sampled, label it as B's and say whether it was taken after a run or at standstill. Our article on where you take an oil sample explains why the operating state belongs on the label.

When a standby bearing comes out, keep the evidence

Keep the removed bearing unwashed. NTN-SNR's guide is direct about this: never clean a bearing before examination, because the lubricant and any particles in it are part of the evidence (NTN-SNR, PDF p. 10). Note which bearing it was, which way round it was fitted and where the load zone sat.

Marks at rolling-element spacing show that something happened while the bearing was not turning, but more than one cause leaves that pattern. Vibration at standstill gives shallow, worn false brinelling marks. Water at standstill gives corrosion or etching. A static overload, such as a mounting force pushed through the rolling elements, leaves dents at the same spacing (SKF, pp. 50, 52 and 56).

Each points to a different fix: isolation and rotation, sealing and drainage, or handling and fitting practice. So have the bearing examined by someone qualified in damage analysis before deciding which fix the standby needs.

Start with one pair

Choose one pair and check three things: B's present state, the pump and motor instructions that apply to it, and the evidence from its last comparable run. If one is missing, make it a named action rather than a blank nobody owns.

Write the document numbers on B's record and mark the coupling position after each required hand turn. On the next planned run, keep the operating conditions, elapsed run time and measurement method with the readings. That gives the next check a usable baseline.

The next unexpected trip is a poor time to discover that nobody knows how B sounded on its last planned run.

Machinery Lubrication I (MLT I / MLA I) covers lubricant application, storage and handling, contamination control and field inspections, the skills a standby routine draws on. Practical Industrial Lubrication Orientation Training (PILOT) is an in-house, plant-floor course for the people who grease, top up, inspect and handle lubricants.

References

  1. SKF. Bearing damage and failure analysis, PUB BU/I3 14219/3 EN, June 2025. pp. 14, 26, 28, 40, 41, 50, 52, 56.
  2. NTN-SNR. Causes of bearing failures (SNR Expert Diagnosis), SNR, 2003, still published on NTN-SNR's website. PDF pp. 10, 21, 22, 28.
  3. SKF Evolution. Rodriguez, D. and Meyers, K. E. “Bearing damage analysis: ISO 15243 is here to help you”, 10 August 2022.
  4. ISO 15243:2017, Rolling bearings: Damage and failures: Terms, characteristics and causes, edition 2, confirmed in 2022 and current at 19 October 2026 (a revision is in working draft). Paid standard: we read only the public catalogue page and abstract; the classification is cited through SKF's reproduction, which SKF states is identical (reference 1, p. 40).
  5. KSB. Vitastage Installation/Operating Manual, 1969.85/03, 15 December 2017. Sections 3.3, 6.3.1, 7.1, 7.2.1.
  6. Flowserve. Durco Mark 3 Sealed Metallic Pumps, Mark 3 ANSI User Instruction 71569102 EN, released 5 July 2025. Sections 4.6, 4.6.2, 5.3.1.1, 6, 8.2; Table 6 note, p. 46.
  7. A.R. Wilfley and Sons. Model K Assembly guide (installation and start-up, pump storage). Undated.
  8. Baldor Electric Company (ABB). Long Term Storage Procedure: Large AC Motors, MN439, 5/15.
  9. WEG. Installation, Operation and Maintenance Guide: Low and High Voltage Electric Motors, document 50031071/25. Section 2.
  10. WEG. Three Phase Induction Motors, T Line, Squirrel Cage Rotor: Installation, Operation and Maintenance Manual, 12364818, revision 04, September 2026. Sections 3.3.2 and 3.3.2.6.
  11. Sulzer Management AG. US Patent 10,274,015 B2, Bearing for a pump and method of retrofitting a bearing for a pump, 30 April 2019. Background.
  12. Reliability Engine. Pak, B. “Redundant on Paper: How to Tell Whether Your CDU's Spare Pump Will Protect the GPUs”, 8 October 2026.
  13. SKF Evolution. “Bearing housing family extended with model suitable for oil lubrication”, 8 December 2005 (oil pick-up ring principle).